Sunday, January 30, 2011

Shed with Blocking and Roof


This view shows the roof decking installed and the blocking (most of blocking had to be done with a nail-gun because of the tight spacing between 2/4s). The nail gun was much easier than a hammer. Just aim and shoot. It was fun!
The next phase of construction is to install the skylight and the siding.

Front of Shed with Blocking and Roof Installed


Wednesday, September 2, 2009

Almost Finished Project!


The installation of the cabinets is complete along with counter-top. The only things remaining are to do touch-up paint, caulk counter-top, and organize tools, etc. into the space.

Cabinet Installation


The bottom cabinets were installed so a rolling tool box could be stored in the middle space.