Wednesday, September 2, 2009

Almost Finished Project!


The installation of the cabinets is complete along with counter-top. The only things remaining are to do touch-up paint, caulk counter-top, and organize tools, etc. into the space.

Cabinet Installation


The bottom cabinets were installed so a rolling tool box could be stored in the middle space.

Third Car Garage Project


The taping, texturing, and painting was finished including epoxy paint on the floor of the garage.