Sunday, January 30, 2011

Shed with Blocking and Roof


This view shows the roof decking installed and the blocking (most of blocking had to be done with a nail-gun because of the tight spacing between 2/4s). The nail gun was much easier than a hammer. Just aim and shoot. It was fun!
The next phase of construction is to install the skylight and the siding.

No comments: